Washington DC Home Addition Permits 2026
Washington DC home addition permit fees, plan review, and required inspections for 2026.
Washington DC Home Addition permit basics
- Building department: DC Department of Buildings (DOB)
- Department URL: https://dob.dc.gov
- Permit fee typical: $400 - $3,500 permit fee
- Plan review + approval: 10-25 business days
- Inspections required: 6-12 inspections (footing, framing, electrical, plumbing, mechanical, insulation, drywall, final)
Washington DC Home Addition common issues
Setback compliance, FAR (floor-area ratio), structural review required, sewer/water capacity may need upgrade.
Washington DC-specific permitting context
DC DOB and DCRA have strict historic preservation review (HPRB). License + basic business license required. DC has no state taxes but has its own sales tax (6%).
Climate factors: Humid subtropical; freeze-thaw cycles; historic preservation drives material choices
District of Columbia licensing for Home Addition contractors
DC Department of Consumer and Regulatory Affairs - required: $390 (basic business license). Board: https://dcra.dc.gov.
Mechanics lien deadline in District of Columbia: 90 days from completion. Preliminary notice: Not required.
Washington DC Home Addition sales tax
District of Columbia sales tax: 6% (no local addition). Real property labor not taxable; TPP repair labor is taxable.
Verify with the DC Office of Tax and Revenue.
Track Washington DC permits with KaamCam
KaamCam jobs have built-in permit tracking - permit number, date issued, inspection schedule, and inspector contact. Auto-reminders before each inspection date. $12 per seat per month. Start a free 14-day trial.