Miami Kitchen Remodel Permit 2026: Fees, Inspections, Timeline

Miami kitchen remodel permit fees, plan review, and required inspections for 2026.

Miami Kitchen Remodel Permits 2026

Miami kitchen remodel permit fees, plan review, and required inspections for 2026.

Miami Kitchen Remodel permit basics

  • Building department: Miami-Dade County Building Department (Regulatory and Economic Resources)
  • Department URL: https://www.miamidade.gov/global/economy/building/home.page
  • Permit fee typical: $200 - $1,200 permit fee
  • Plan review + approval: 10-25 business days for residential plan review
  • Inspections required: 4-6 inspections (electrical rough, plumbing rough, framing, insulation, drywall, final)

Miami Kitchen Remodel common issues

GFCI placement, ventilation requirements (microwave OTR vs hood), gas line work requires separate permit.

Miami-specific permitting context

Miami-Dade and Broward sit in the High Velocity Hurricane Zone (HVHZ), so windows, doors, roofing and other products must carry a Miami-Dade Notice of Acceptance (NOA) product approval and meet impact and 175 mph design standards. Following the Surfside collapse, Florida now mandates milestone structural recertification of condos three stories and taller at 25 or 30 years, driving heavy structural repair demand.

Climate factors: Hurricane-exposed coastal climate with salt-air corrosion, year-round high humidity and AC load, and the nation's strictest high-velocity wind design requirements.

Florida licensing for Kitchen Remodel contractors

Florida Department of Business and Professional Regulation (DBPR) - required: $249 (Certified) or $209 (Registered). Board: https://www.myfloridalicense.com.

Mechanics lien deadline in Florida: 90 days from last work. Preliminary notice: Notice to Owner REQUIRED within 45 days of first furnishing for non-direct contractors.

Miami Kitchen Remodel sales tax

Florida sales tax: 6% + local (~7% combined avg). Real property construction labor NOT taxable. Some installation labor is taxable if items remain TPP (e.g., portable buildings).

Verify with the Florida Department of Revenue.

Track Miami permits with KaamCam

KaamCam jobs have built-in permit tracking - permit number, date issued, inspection schedule, and inspector contact. Auto-reminders before each inspection date. $12 per seat per month. Start a free 7-day trial.

Related Miami resources