Indianapolis Kitchen Remodel Permits 2026
Indianapolis kitchen remodel permit fees, plan review, and required inspections for 2026.
Indianapolis Kitchen Remodel permit basics
- Building department: Indianapolis Department of Business and Neighborhood Services
- Department URL: https://www.indy.gov/dept/bns
- Permit fee typical: $200 - $1,200 permit fee
- Plan review + approval: 5-12 business days
- Inspections required: 4-6 inspections (electrical rough, plumbing rough, framing, insulation, drywall, final)
Indianapolis Kitchen Remodel common issues
GFCI placement, ventilation requirements (microwave OTR vs hood), gas line work requires separate permit.
Indianapolis-specific permitting context
Indianapolis (Indy Unigov) requires Local Contractor License separate from any state license. Plumbing and HVAC require state license. No statewide GC license.
Climate factors: Cold winters; severe storms; freeze-thaw cycles
Indiana licensing for Kitchen Remodel contractors
No statewide GC license; municipal (Indianapolis, Fort Wayne, etc.) require local license - no statewide license, but Indianapolis likely requires local registration.
Mechanics lien deadline in Indiana: 90 days from last work (60 days for owner-occupied residential). Preliminary notice: Pre-lien notice required for owner-occupied residential within 60 days of starting.
Indianapolis Kitchen Remodel sales tax
Indiana sales tax: 7% (no local on most categories). Real property labor exempt. Contractor pays sales tax on materials at purchase.
Verify with the Indiana Department of Revenue.
Track Indianapolis permits with KaamCam
KaamCam jobs have built-in permit tracking - permit number, date issued, inspection schedule, and inspector contact. Auto-reminders before each inspection date. $12 per seat per month. Start a free 14-day trial.