San Antonio Kitchen Remodel Permits 2026
San Antonio kitchen remodel permit fees, plan review, and required inspections for 2026.
San Antonio Kitchen Remodel permit basics
- Building department: City of San Antonio Development Services
- Department URL: https://www.sa.gov/Directory/Departments/DSD
- Permit fee typical: $200 - $1,200 permit fee
- Plan review + approval: 4-10 business days
- Inspections required: 4-6 inspections (electrical rough, plumbing rough, framing, insulation, drywall, final)
San Antonio Kitchen Remodel common issues
GFCI placement, ventilation requirements (microwave OTR vs hood), gas line work requires separate permit.
San Antonio-specific permitting context
San Antonio has no general contractor licensing at the city level. TDLR state license required for HVAC, electrical, plumbing. UDC zoning rules strict in historic districts (King William, Monte Vista).
Climate factors: Hot subtropical; foundation issues common in clay soils; minimal cold-weather concerns
Texas licensing for Kitchen Remodel contractors
Texas Department of Licensing and Regulation (TDLR) - for HVAC, electrical, plumbing only; no statewide GC license - no statewide license, but San Antonio likely requires local registration.
Mechanics lien deadline in Texas: 15th day of 4th month after last work (residential); 15th day of 3rd month (commercial). Preliminary notice: Notice to owner required by 15th day of 2nd month after first work for residential.
San Antonio Kitchen Remodel sales tax
Texas sales tax: 6.25% + local (~8.2% combined avg, capped at 8.25%). NEW CONSTRUCTION labor exempt. REMODELING and REPAIR labor on real property TAXABLE. Lump-sum vs. separated contracts treated differently.
Verify with the Texas Comptroller of Public Accounts.
Track San Antonio permits with KaamCam
KaamCam jobs have built-in permit tracking - permit number, date issued, inspection schedule, and inspector contact. Auto-reminders before each inspection date. $12 per seat per month. Start a free 14-day trial.