Portland Home Addition Permits 2026
Portland home addition permit fees, plan review, and required inspections for 2026.
Portland Home Addition permit basics
- Building department: City of Portland Bureau of Development Services (BDS)
- Department URL: https://www.portland.gov/bds
- Permit fee typical: $400 - $3,500 permit fee
- Plan review + approval: 7-20 business days
- Inspections required: 6-12 inspections (footing, framing, electrical, plumbing, mechanical, insulation, drywall, final)
Portland Home Addition common issues
Setback compliance, FAR (floor-area ratio), structural review required, sewer/water capacity may need upgrade.
Portland-specific permitting context
Portland BDS has strict energy code (Reach Code option). Stormwater management requirements. CCB license required for all contractor work in Oregon.
Climate factors: Mild wet winters; rare snow; moss/moisture issues on roofs; minimal AC historically
Oregon licensing for Home Addition contractors
Oregon Construction Contractors Board (CCB) - required: $325 + $20K bond + liability insurance. Board: https://www.oregon.gov/ccb.
Mechanics lien deadline in Oregon: 75 days from last work (90 days for owner-occupied residential). Preliminary notice: Notice of right to lien required within 8 days of first furnishing for owner-occupied residential.
Portland Home Addition sales tax
Oregon sales tax: No state sales tax (CAT 0.57% on commercial activity over $1M). No sales tax. Corporate Activity Tax (CAT) at 0.57% on commercial activity over $1M annual.
Verify with the Oregon Department of Revenue.
Track Portland permits with KaamCam
KaamCam jobs have built-in permit tracking - permit number, date issued, inspection schedule, and inspector contact. Auto-reminders before each inspection date. $12 per seat per month. Start a free 14-day trial.